Trailer Remodeling: Mega Project for Complete Renovation
Follow the impressive transformation of a trailer in a complete remodeling project by Frank’s Handyman Service. Over 16 days, the team undertook detailed tasks including painting, flooring installation, roof renovation, and carpentry. Watch each stage of the process, from initial preparation to final touches, and see how an old trailer is turned into a modern and functional home. Visit our blog to watch daily videos and learn more about our remodeling services!
Day 1: Full Home Remodel – Painting, Carpeting, Woodwork, and More
Video Description: On the first day of our extensive home remodeling project, the Frank’s Handyman team begins by removing old materials and prepping the house for a full renovation. Key tasks include clearing out debris, removing old toilets and smoke alarms, filling wall holes, fixing bedroom tiles, and removing carpets. The team also treats and cleans the floors, preps the ceiling for painting using a spray gun, and tackles the rotten exterior stairs.
Transcript Highlights:
- Removal of old materials for a clean slate.
- Detailed floor and wall preparation.
- Efficient ceiling painting with a spray gun.
- Removal of rotten exterior stairs.
Watch the transformation begin: Full Home Remodel Day 1
Day 2: Texturing, Painting, and Wood Restoration
Video Description: Day two focuses on finishing the ceiling details, sanding walls to remove imperfections, and restoring the deck with chemical treatments. The team also preps for painting by taping and covering areas to avoid staining.
Transcript Highlights:
- Sanding walls to remove imperfections.
- Chemical treatment for deck restoration.
- Prepping walls and ceilings for painting.
Continue watching: Day 2 – Texturing, Painting, and Wood Restoration
Day 3: Landscaping and Exterior Cleaning
Video Description: The third day is dedicated to landscaping and exterior cleaning. The team cuts grass, trims bushes, and ensures the yard looks pristine. Additionally, small trees are removed to improve the overall appearance.
Transcript Highlights:
- Grass cutting and bush trimming.
- Removal of small, unhealthy trees.
- Ensuring a clean and tidy exterior.
Watch the progress: Day 3 – Landscaping and Exterior Cleaning
Day 4: Texturing and Repairs
Video Description: On day four, the team applies wall texture to create an even surface for painting. Additional tasks include door frame repairs, door knob adjustments, and thorough cleaning of doors using industrial soap.
Transcript Highlights:
- Application of wall texture for even painting.
- Repairing and adjusting door frames and knobs.
- Industrial cleaning of doors.
Check out the repairs: Day 4 – Texturing and Repairs
Day 5: Roof Removal and Preparation
Video Description: The fifth day involves removing the old roof tiles and prepping for new installations. The team carefully disposes of old materials, ensuring safety and cleanliness throughout the process.
Transcript Highlights:
- Removal of old roof tiles.
- Safe disposal of hazardous materials.
- Preparing for new roof installation.
See the roof work: Day 5 – Roof Removal and Preparation
Day 6: Roof Installation and Wood Cutting
Video Description: Day six focuses on cutting and installing new roof materials. The team uses staples for secure attachment and ensures all wood pieces are correctly measured and placed.
Transcript Highlights:
- Cutting and installing new roof materials.
- Secure attachment using staples.
- Accurate measurement and placement of wood pieces.
Watch the installation: Day 6 – Roof Installation and Wood Cutting
Day 7: Roof Replacement and Skylight Adjustment
Video Description: On the seventh day, the team continues replacing the roof and adjusts the skylights for proper fitting. They also replace rotten poles and ensure the new roof materials are securely installed.
Transcript Highlights:
- Continued roof replacement.
- Adjusting and fitting skylights.
- Replacing rotten poles and securing new materials.
View the adjustments: Day 7 – Roof Replacement and Skylight Adjustment
Day 8: Roof and Terrace Renovation
Video Description: Day eight involves fixing the ceiling and renovating the terrace. The team removes old wood, drywall, and nails, replacing them with new materials. They also ensure proper drainage and roof stability.
Transcript Highlights:
- Fixing the ceiling and renovating the terrace.
- Removal and replacement of old materials.
- Ensuring proper drainage and stability.
See the terrace work: Day 8 – Roof and Terrace Renovation
Day 9: Roof and Terrace Renovation Continued
Video Description: The ninth day continues the roof and terrace renovation. The team finalizes the roof installation, ensuring all nails and staples are securely placed. They also clean the exterior thoroughly.
Transcript Highlights:
- Finalizing roof installation.
- Securing nails and staples.
- Thorough exterior cleaning.
Watch the progress: Day 9 – Roof and Terrace Renovation Continued
Day 10: Terrace and Ramp Renovation
Video Description: Day ten focuses on renovating the terrace and ramp. The team treats the wood, removes old materials, and ensures the new installations are secure and well-fitted.
Transcript Highlights:
- Renovating the terrace and ramp.
- Treating and replacing wood.
- Ensuring secure and well-fitted installations.
See the ramp work: Day 10 – Terrace and Ramp Renovation
Day 11: Stair and Deck Installation
Video Description: On the eleventh day, the team installs new stairs and a deck. They measure, cut, and fit wood pieces accurately, ensuring a sturdy and aesthetic finish.
Transcript Highlights:
- Installing new stairs and deck.
- Accurate measurement, cutting, and fitting.
- Ensuring a sturdy and aesthetic finish.
Watch the installation: Day 11 – Stair and Deck Installation
Day 12: Stair Installation and Painting
Video Description: Day twelve involves finalizing the stair installation and beginning exterior painting. The team ensures the stairs are level and secure, and they prepare walls for painting by filling holes and using primer.
Transcript Highlights:
- Finalizing stair installation.
- Preparing walls for painting.
- Ensuring level and secure stairs.
See the painting: Day 12 – Stair Installation and Painting
Day 13: Gutter Installation and Floor Preparation
Video Description: The thirteenth day focuses on gutter installation and floor preparation. The team measures and cuts flooring materials, ensuring a perfect fit. They also paint the exterior and protect the newly painted areas.
Transcript Highlights:
- Installing gutters.
- Measuring and cutting flooring materials.
- Painting and protecting exterior areas.
Watch the preparation: Day 13 – Gutter Installation and Floor Preparation
Day 14: Flooring Installation and Deck Finishing
Video Description: On day fourteen, the team installs new flooring and finishes the deck. They sand and paint the handrails and other wood parts, ensuring a smooth and polished look.
Transcript Highlights:
- Installing new flooring.
- Sanding and painting handrails.
- Ensuring a smooth and polished look.
See the finishing touches: Day 14 – Flooring Installation and Deck Finishing
Day 15: Final Touches and New Carpet
Video Description: Day fifteen is all about the final touches and installing new carpet. The team ensures all rooms have well-fitted carpet and addresses any remaining details in the house.
Transcript Highlights:
- Installing new carpet.
- Final touches on various house details.
- Ensuring well-fitted and clean installations.
Watch the final touches: Day 15 – Final Touches and New Carpet
Day 16: Complete Transformation
Video Description: On the final day, the team completes the transformation of the house. They clean up all remaining debris, ensure every detail is perfect, and present the finished project.
Transcript Highlights:
- Final cleanup and detailing.
- Presenting the fully transformed house.
- Ensuring perfection in every aspect.
See the complete transformation: Day 16 – Complete Transformation
Trailer Remodeling: Mega Project for Complete Renovation
Phase 1: Preparation and Initial Repairs (Days 1-5)
The project began with thorough preparation and initial repairs. The team removed old materials, treated floors, filled wall holes, and prepped the ceilings for painting. Key tasks included:
- Clearing debris and old carpets.
- Removing toilets, smoke alarms, and rotten exterior stairs.
- Sanding walls and treating the deck with chemicals.
- Removing old roof tiles and preparing for new installations.
Phase 2: Structural and Exterior Work (Days 6-10)
During the second phase, the focus shifted to structural improvements and exterior renovations. This included:
- Installing new roof materials and adjusting skylights.
- Renovating the terrace and ramp, replacing rotten wood.
- Landscaping and exterior cleaning, including grass cutting and tree trimming.
- Installing new stairs and preparing walls for painting.
Phase 3: Finishing Touches and Interior Updates (Days 11-16)
The final phase involved completing the interior updates and applying finishing touches. The team worked on:
- Installing new flooring and painting interiors.
- Finalizing deck construction and stair installation.
- Applying final coats of paint and detailed cleaning.
- Installing new carpet and addressing last-minute details to ensure a pristine finish.